Implementation of a water supply system modernization project in Kyzyl-Suu village

Снимок экрана 2026 05 03

A large-scale project to modernize the water supply system is being implemented in Kyzyl-Suu village, Jeti-Ögüz district of Issyk-Kul region. The project aims to improve water service quality and ensure sustainable access to safe drinking water.

The project includes the following works:
– construction of 4–5 water wells
– development of water intake facilities
– installation of a drinking water disinfection system
– full reconstruction of the water distribution network
– establishment of sanitary protection zones

The project introduces modern technologies, including energy-efficient pumps and water treatment systems, which will significantly improve service quality.

The implementation period is approximately 18 months, followed by a warranty operation period.

The project is carried out in compliance with environmental and social standards, ensuring minimal environmental impact.

As a result, residents of the village will have reliable access to clean and safe drinking water.

Appeal form

Required fields are marked with an asterisk*.


Форма Обращения

Обязательные для заполнения поля отмечены звездочкой*


Кайрылуу формасы

Милдеттүү талаалар жылдызча* менен белгиленген